Total demand — MW
LCOE
Renewable — %
Annual CO₂ — kt
Status
Click a highlighted substation to connect
Energy copilot. Ask it to design and site a data centre — it runs the optimizer and the 50 Hertz site scan, then saves results to your Aiven Postgres database through the Aiven MCP, so you can compare runs later.
Find the best site and energy configuration for a 120 MW load, then chart the cost Optimize a 90 MW load in Frankfurt and pick the best 50Hertz site Optimize my uploaded load profile and save the run Rank my saved runs by LCOE
IT load coverage
Grid Solar Battery Firm
3D SCENE
Data halls
Solar field
Battery yard
Firm backup
Substation / grid
hour —
24h dispatch (design day) Battery state of charge Year heatmap Solar outlook Outage risk Grid draw Firm Shortfall Price Worst week →